Minor Works on Sydney Water Infrastructures
Ausflow are highly experienced in all kind of minor works for sewer and water including:
- Construction of new water services and drilling to Sydney Water’s watermains,
- Sewer sidelines and property connection points construction works,
- Cutting in junctions,
- Concrete Encasement of sewer.
We are Sydney Water accredited under the following categories for Major Works:
PE– PE pipe systems
LP– Pressure Sewer Systems
RW – Recycled Water
MS – Minor Sewer
S1 – Sewerage Reticulation (150mm to 300mm)
S2 – Sewerage reticulation (300mm to 750mm)
W1 – Water Reticulation (150 to 375mm)
W2 – Water reticulation (375 to 750mm)
W3 – Water reticulation (750 to 1,200mm)
D1 – Licensed plumber accredited by Sydney Water to apply/perform/supervise water services connections
We have a dedicated office-based project manager for all our construction projects. Our project management and quality insurance can cover all the needs to complete any project, including:
- Coordination of the construction commencement stage and organise any inspections required by Sydney Water and/or the WSC,
- Liaise with Sydney Water, and/or Sydney Water Representatives through-out the entire duration of the project,
- Submission of Ausflow Insurances & Project Quality Assurance documents including Safe Work Methods Statement, Environmental Management Plant, Construction Management Plan and Incident Management Plan,
- Carry out toolbox talks on site when required,
- Construction and site supervision of all works in accordance with Sydney Water’s standard drawings and instructions for minor works,
- Desktop or site investigation of existing mains and other underground utility services,
- Dial before you dig services,
- All required site visits and meetings.
Our site crew and experienced foremen are well trained to carry out all the required tasks, including:
- Organize services location and marking of existing services with our in-house services location team,
- Implementing confined space measures (tripod, gas detector…) if required,
- Setting up basic traffic signs if required, and organize traffic control specialized companies to assist where required,
- Install tafficable road plates if required,
- Floatage in and out of all required plants, equipment and tools,
- Carry out all excavation and benching/shoring of trenches, using 0.8 to 13.5t excavators to respond to the scale and accessibility of all projects,
- Supply all parts and fittings,
- Supply and transportation of backfilling materials,
- Organize all required testing as per Sydney Water’s standard,
- Backfilling and compacting of trenches,
- Temporary restoration of disturbed roads and footpaths surfaces (50mm cold mix).
Contact our estimator now for a fast and free quote.
All excess spoil can be removed after works if requested.
We book all WSC inspections for Sydney Water sewer encasments
Concrete curing after Sydney Water sewer encasement completed
Ausflow constructing Large Water services.
Trench and pipe embedment for Sydney Water’s large water services.
New Sydney Water Sewer sidelines connections
Our minor works crew can be booked at short notice to construct sidelines connecting your development to Sydney Water reticulation network
All access equipment to Sydney Water assets
Small access to Sydney Water assets is usually not a problem for our crew.